Progress

Five acres of land has been secured on the West side of Maui in Olowalu.
We have submitted the necessary documentation for the special land use permit.
Once our building permits are secure we will begin construction

 

Below is a breakdown:

Phase 1
-Design of  Horticultural and Agricultural layout
-Begin planting wind barrier plants around the perimeter
-Building permits
-Land excavation

 

Phase 2
-Infrastructure
-Installment of water electricity and sewage
-Archaeological summary
-Site survey
-fulfill legal notification requirements to existing neighbors
-Traffic Impact analysis
-Drainage and Erosion Control analysis
-Waste Water System Design
-Topographical Design Survey
-Construction Permitting Phase
-Grading
-Septic

 

Phase 3
-Construction of cabins ( We will build as funding allows)
– Building paved trails
-Grass and pool structure